|
|
发表于 2008-4-10 12:12:10
|
显示全部楼层
tecplot画出的流线为什么有断截的情况?
• Step Size - Enter the initial and maximum step size Tecplot uses while inte­grating through the vector field, as a decimal fraction of the local cell or ele­ment width. A typical value (and the default) is 0.25, which results in four integration steps through each cell or element. The value for Step Size affects the accuracy of the integration. Setting Step Size too small can result in round-off errors, while setting it too large can result in truncation errors and missed cells.
• Max Steps - Enter the maximum number of steps before the streamtrace is ter­minated. This prevents streamtraces from spinning forever in a vortex, or from wandering aimlessly in a region where the vector components are very small, very random, or both. If you choose a small Step Size, you should enter a larger Max Steps.
• Minimum Step Size - The smallest step size for Tecplot to use. Setting this too small results in integration problems. Setting this greater than or equal to the Step Size results in a constant step size.
• Obey Source Blanking - When active, streamtraces are generated for non-blanked regions only. When inactive, streamtraces are generated for blanked and unblanked regions.
|
|